Carbro Contractors Replaces Ridge Road, Orient Way Bridges for NJDOT

The New Jersey Department of Transportation (NJDOT) is investing $26.7 million to replace the current Ridge Road Bridge (107 ft. long, one lane in each direction) and the Orient Way Bridge (107 ft. long, two lanes in each direction) over Route 3 in the Township of Rutherford in Bergen County. The Ridge Road Bridge, which carries 14,000 vehicles per-day, and the Orient Way Bridge, which carries 24,000 vehicles per-day, are several decades old....

from RSSMix.com Mix ID 8246474 https://ift.tt/2TirGlS
via Inchiriere buldozere - Tuscher & Milas Company

Comentarii

Postări populare de pe acest blog

Construction News – Video: Man's Lego Crane Creation Lifts Furniture With EaseOriginally Posted on January 3, 2018 and reposted on February 14, 2018

Doosan Excavators | 2017 Key Features

New Infrastructure Funding Sources Step Up in Canada