Bent Crews Replace Farmer Creek Bridge Along U.S. 101

Bent LLC is in the midst of replacing the Farmer Creek Bridge on U.S. 101 just north of Hebo, a structure built in 1916, for the Oregon Department of Transportation (ODOT). The existing 27-ft. long, two-lane steel bridge is being replaced with a concrete, 80-ft. long and 50-ft. wide, two-lane single span bridge....

from RSSMix.com Mix ID 8246474 https://ift.tt/34fBfbn
via Inchiriere buldozere - Tuscher & Milas Company

Comentarii

Postări populare de pe acest blog

Construction News – Video: Man's Lego Crane Creation Lifts Furniture With EaseOriginally Posted on January 3, 2018 and reposted on February 14, 2018

Doosan Excavators | 2017 Key Features

New Infrastructure Funding Sources Step Up in Canada